The Harvester Road and North Service Road corridors hold a long run of mid-size manufacturers and packagers — buildings in the 20,000 to 100,000 square foot range, usually owner-occupied, often with the same ownership for decades. That prof…
The Harvester Road and North Service Road corridors hold a long run of mid-size manufacturers and packagers — buildings in the 20,000 to 100,000 square foot range, usually owner-occupied, often with the same ownership for decades. That profile produces a particular pattern: capable systems installed fifteen years ago, still running, now unsupported and impossible to get footage out of in a usable format. Migration planning matters more here than greenfield design.
Long-tenured owner-occupiers running ageing systems. Export format and evidentiary usability are frequently the actual problem, not coverage.
Burlington is approximately 55 km from our Toronto office at 170 The Donway West, Unit 151.
Specified by pixel density, not by megapixels
Read more →Retention you can actually prove, on hardware built for it
Read more →Credentials that cannot be copied in a parking lot
Read more →Alarms that mean something, so someone still answers them
Read more →Protection on day one, before there is power or a fence
Read more →Someone watching, not just something recording
Read more →Yes. Burlington is about 55 km from our Toronto office and well within our service area. We work regularly in Burlington Business Park, Harvester Road corridor and the surrounding employment lands.
Commercial and industrial only — manufacturing, food and beverage, packaging and similar. We do not install residential systems.
A walk of the site to establish what each area needs to deliver, a look at the existing cabling, electrical capacity and network, and a written design showing pixel density per camera position, the storage calculation and the PoE budget.