North York mixes commercial office, institutional and remnant industrial along the 401 and Allen corridors, with Downsview in long transition. A high proportion of work here is retrofit into occupied buildings, where the practical constrain…
North York mixes commercial office, institutional and remnant industrial along the 401 and Allen corridors, with Downsview in long transition. A high proportion of work here is retrofit into occupied buildings, where the practical constraints are working hours, tenant disruption and what can be run through an existing ceiling without opening it up.
Occupied-building retrofit is the norm. Install sequencing and after-hours access tend to drive the schedule more than the equipment does.
North York is approximately 18 km from our Toronto office at 170 The Donway West, Unit 151.
Specified by pixel density, not by megapixels
Read more →Retention you can actually prove, on hardware built for it
Read more →Credentials that cannot be copied in a parking lot
Read more →Alarms that mean something, so someone still answers them
Read more →Protection on day one, before there is power or a fence
Read more →Someone watching, not just something recording
Read more →Yes. North York is about 18 km from our Toronto office and well within our service area. We work regularly in Downsview, Keele–Finch and the surrounding employment lands.
Commercial and industrial only — commercial property, light manufacturing, automotive and similar. We do not install residential systems.
A walk of the site to establish what each area needs to deliver, a look at the existing cabling, electrical capacity and network, and a written design showing pixel density per camera position, the storage calculation and the PoE budget.